Following technical correspondence, the TFV6 Project has been reviewed and officially archived within the BMW Group Powertrain Division system.
Design Iteration No. 3 completed. The integration of a linear crosshead bearing successfully theoretically solves the bottom-cylinder sealing challenge.
Track Works Engineering Group formally established in İzmir with a multi-disciplinary core team covering Systems, CAD, and Strategy.